ENGINEERING AND TECHNICAL INFRASTRUCTURE 
The company has:
- modern automatic boiler house,
with equipment of the German company BUDERUS with a capacity of 9.15 MW (7.87 Gcal/hour), this gives
the ability to provide heat and hot water supply to both own production and tenants with almost any type of activity
- four transformer substations that are able to provide tenants with the necessary power for them
ventilation and air conditioning system operating on the principle of "climate control" and consisting of climatic installations of the American company "CARRIER", water heaters with hot water are used to heat the air in winter.
Production
115201, Moscow, Kotlyakovskaya str., 3